Repairing a Stem With a Dutchman Update II 1 23 2014

What a nice way to end the week! John has continued working on the Dutchman repair to the 1953 Shepherd’s stem. I hope you will agree as you view this clip that he’s made some solid progress.
We filled the cavities around the original carriage bolts with Jamestown Distributors Thixo Thickened Epoxy, which we will allow to cure over the weekend.
Then John will use the same adhesive to bond the stem and knee components of this Dutchman repair to the native surfaces, securing them temporarily in place with wood screws. 3M 5200 will be applied on the two elements’ joining faces.
Once the adhesive has cured and the screws have been removed, John will complete his final sanding-in process and drill new carriage bolt holes from the inside out.
Yes, surfaces will be sealed with CPES prior to being glued in place.
We are doing a Dutchman repair workshop this Saturday, and hope to have some interesting content uploaded next week.
Description