1950 Shepherd Runabout 5200 Bottom Hullsides Update

1950 Shepherd Runabout 5200 Bottom Hullsides Update

While waiting for the Meranti mahogany planking that we will mill into bottom planks so we can finish her True 5200 Bottom, we turned our attention to her hullsides and transom.

Stripping them to bare wood revealed the eternal truth about old wooden boats: You can never know all the secrets she is hiding behind her skirts until you get there.

As you see in the clip, this time she revealed quite a few rotted, split and unsavable planks, and two splash rails with so much rot in their interior faces that many of them must be replaced.

We have been hard at doing so, along with executing a sea of Dutchman repairs – gouges, tears, and splits from what must have been unfortunate encounters with unfriendly docks.

Once we have the bottom and hullside planking installed and faired, she will receive a Don-Danenberg-inspired presoaking.

Fairing and sealing the bottom with four coats of Smith’s CPES will be next, followed by applying five coats of Interlux Interprotect 2000E Barrier Coat Primer.

The hullsides and transom will be bleached, stained with Lowboat.com Jel stain and sealed with CPES before varnishing begins.

For a comprehensive roster of the materials we use and their sources, please click here.

Happy Thanksgiving!

1940 17 Chris Craft Barrelback 5200 Bottom Planking Update

1940 chris craft barrelback bottom planking

Priscilla, our 1940 17-foot Barrelback “lab rat” experiment is progressing rapidly now that we finally took delivery and milled the Meranti mahogany planking needed to complete her True 5200 bottom. As we shared in our last update, rather than install her inner skin using 6 mm plywood panels, we are reverting to what is a truly very old school alternative: replacing the inner skin using strips of planking laid at approximately 45 degrees to the keel.

In so doing, we will deliver a bottom, the inner skin of which precisely matches that installed in Algonac in 1940.

Once we dry-fitted each, approximately 5-3/4”-wide plank, everything was sealed with four coats of Smith’s CPES, after which we have applied three coats of Chris-Craft mahogany bilge paint to their inner surfaces. Next, we installed these planks bedded in mahogany 5200 using #6×1” Frearson-drive, flathead silicon bronze wood screws.

Happily, her bilge now presents exactly as it did when Priscilla left Algonac in 1940.

Planking the inner skin produces a tighter, more rigid skin that follows the bottom’s contours precisely. Any interior squeeze-out will be removed using nylon putty knives before it, too, receives three full coats of Chris-Craft mahogany bilge paint.

Post this experiment, SMB will make individually planking inner skins our standard for SMB True 5200 bottoms.

With the Meranti planking in-hand, and having milled it to land fair with the chines, and began dry fitting it to her bottom. Our first step involves measuring both bottom faces at their widest point between the keel and the chine.

Here, and as we’ve shared with you earlier, we once again confirmed that Chris-Craft’s rule-of-thumb was operating at Algonac when her hull was being laid out. She is 7/8” wider on port than she is on starboard at the widest point between her keel and chines. And, at the transom, she is a 1/2” wider on starboard than she is on port.

Joe will dry fit and fasten the outer planks temporarily, working from her keel to her chines. Once laid out completely, the planks will be released and sealed on all sides with four coats of Smith’s CPES. We will also apply one final “insurance” coat of CPES to her inner skin’s bottom.

The final assembly step involves bedding each outer plank in an at least one-eight-inch-thick bed of white 3M5200, before fastening them with #8×1-1/4” flathead silicon bronze wood screws. Finally, and that’s when she really begins looking good, we apply five coats of Interlux InterProtect 2000E Barrier Coat Epoxy Primer, with alternating gray and white coats, which helps expose any holidays. Per Interlux’s instructions, 2000E should be applied in thin coats.

1940 Chris Craft Barrelback 5200 Bottom Planking

1940 chris craft barrelback 5200 bottom

Priscilla, our 1940 17-foot Barrelback became our lab rat today as we tested what we are calling a New Day at Snake Mountain Boatworks when installing a truly True 5200 bottom.

Rather than install her inner skin using 6 mm plywood panels, we are reverting to what is a truly very old school alternative: replacing the inner skin using 6mm strips of planking laid at approximately 45 degrees to the keel.

In so doing, we are able to deliver a bottom, the inner skin of which precisely matches that installed in Algonac in 1940.

Once we have dry-fitted each, approximately 5-3/4”-wide plank, everything will be sealed with four coats of Smith’s CPES, and we have applied three coats of Chris-Craft mahogany bilge paint to the inner surfaces, we will then install these planks bedded in mahogany 5200 using #6×1” Frearson-drive, flathead silicon bronze wood screws.

Once finished, the bilge will present exactly as it did when Priscilla left Algonac in 1940.

We will then proceed as we do with all SMB True 5200 bottoms, installing the outer mahogany planks bedded in white 5200 using #8×1-1/4” Frearson drive, flathead, silicon bronze wood screws.

Planking the inner skin produces a tighter, more rigid skin that follows the bottom’s contours precisely. Any interior squeeze-out will be removed using nylon putty knives before it, too, receives three full coats of Chris-Craft mahogany bilge paint.

Post this new day, SMB will make individually planking inner skins our standard for SMB True 5200 bottoms.